1. AG真人国际(中国)官方网站

      Stock Code:
      A 000055
      B 200055
      济南市
      Jinan Metro Line 2
      A total of 36 sides of 18 underground stations of Jinan R2 line phase I are equipped with full height adjustable ventilation platform door system, and a total of 2 sides of 1 elevated station are equipped with half height platform door system.
      济南R2线一期工程西起王府庄站,东至彭家庄站,共设车站19座。彭家庄站为高架站,其余车站均为地下车站。
      济南R2线一期18座地下车站共36侧设置全高可调通风型站台门系统,1座高架车站共2侧设置半高站台门系统。

      Previous project

      Shenzhen Metro Line 2

      Next project

      Hong Kong Shatin central line

      Copyright ©2021 Fangda Group Co., Ltd All Right Reserved. 粤ICP备05036140号-1
      友情链接: